Detailed Notes on Contour Survey in Dhaka

It may differ from 20 m to one hundred m. Nearer intervals are needed if floor level differs abruptly. The cross- sectional line need not be normally be at correct angles to the main line. This technique is Preferably suited to road and railway assignments. Radial Line StrategyOne of the major applications of contour lines is to indicate floor elev

read more